In 1998, it marked the inception of our overseas business endeavors. Our initial small workshop successfully fabricated the guyed towers, and under the leadership of our GM Zhang Rui, our team completed the construction of 140m guyed towers in Sudan. These steel towers significantly contributed to the local telecommunications infrastructure, substantially enhancing the quality of life for the community.
In order to cater to the needs of one of the largest media companies in Africa, we provided 10 sets of 60m 4-legged angular steel towers to a client in Tanzania. Additionally, we dispatched a technical guide and a complete set of installation tools to assist them in erecting the towers accurately. These TV towers are currently operational and functioning efficiently. Furthermore, we continue to provide ongoing support and assistance with maintenance to ensure their sustained performance.
We were involved in a power substation project in the Philippines, which encompassed gantries, bus poles, and various components. Through design modifications, we optimized the steel size to enhance structural stability and ensure cost-effectiveness. The fabrication of all components was meticulously executed, and their delivery was handled efficiently.
Guyed towers measuring 18m, 21m, and 24m in height were successfully delivered to Jamaica, where they have been installed on rooftops. These telecom towers underwent both hot-dip galvanization and spraying processes for enhanced durability and corrosion resistance. They were meticulously packaged and accompanied by a detailed factory report to ensure their safe and secure delivery.
76 pieces of 17.6m polygonal power poles were fabricated for a client from England. These steel power poles were redesigned according to national standards and manufactured using Grade 65 steel. All utility poles underwent rigorous testing and inspection to ensure they met qualification standards before delivery
Our client, an energy company in Spain, had wind turbine towers delivered to Japan. A total of 326 steel poles were carefully packed in wooden crates and delivered in batches. These steel tube towers are all hot-dip galvanized and are currently in excellent working condition.
128 pieces of 60 KV power poles and extensions were expertly fabricated and delivered to Callao, Peru. These products are integral to the transmission line project, with tower bodies made of Grade 65 steel and extensions using Q345 steel (China standard). Feedback from our client confirms that they are currently in optimal working condition
7 sets of 30m monopole towers were shipped to Kuala Lumpur, Malaysia. These monopole towers were entirely customized, with modifications made to their shape to suit temple requirements. Our clients expressed great satisfaction with the bespoke workmanship.
13 pieces of 35m guyed towers designed for rooftop placement were dispatched to Singapore. These rooftop towers were meticulously painted and packaged as per the client's specifications, resulting in successful deployment and positive feedback on their usage.
We designed and manufactured 3 sets of 45m monopole towers, delivering them to Tuvalu. These steel tube towers underwent hot-dip galvanization and painting. Additionally, we provided on-site guidance with a skilled installation expert to ensure proper erection.
In response to a client's requirement in the Philippines, we supplied 70m guyed towers. Following delivery, our construction team promptly executed the installation of these guyed towers within 2 weeks. Despite the challenges, the project concluded successfully.
5 sets of 70m 3-legged angular steel towers were dispatched to Nigeria, accompanied by SONCAP documentation. Originally requested as 4-legged towers, our engineers, after assessing the site conditions, recommended 3-legged towers to optimize space. The clients were highly satisfied with this recommendation.
We shipped 10 sets of 70m 4-legged angular steel towers to America to enhance local signal transmission and reception. The production of these telecommunication towers was expedited, completed in just 20 days to fulfill the client's urgent requirements.
7 sets of 45m 4-legged angular steel towers were dispatched to Brunei. These telecom towers were meticulously fabricated in compliance with national standards and underwent rigorous factory testing before delivery.
50m angular steel towers were sent to the local telecom company in the Solomon Islands. These telecom towers will play a crucial role in local signal transmission and reception. We provided installation guidance through instructional videos, ensuring successful tower setup.
A combination of 4X37m and 3X56m four-legged angular steel towers was shipped to a client in Algeria, primarily for improving local telecommunication in remote areas. These towers were designed to meet ANSI/TIA -222-G standards.
The 45m 3-legged angular steel towers, designed according to ANSI/TIA -222-G standards and hot-dip galvanized in line with ASTM A123/153, were delivered to Papua New Guinea for telecommunications purposes.
We manufactured 4 sets of 90m TV towers for Liberia to facilitate local TV signal transmission and reception. Witnessing our steel towers contribute to enhancing people's quality of life is a source of great satisfaction for us.