Junjiang Construction Co., Ltd.
Junjiang Construction Co., Ltd.
info@junjiangtower.com

Trail Assembly of Power Poles

Junjiang electrical steel pole can be designed according deign codes of different countries, made of GB Q345, Q235 or ASTM A572, A36, GR65, GR50, SS400, etc. and processed following relavent national standards. 

Trial assembly method: The trial assembly of steel pipe rods should be vertical or horizontal, with vertical assembly preferred. If segmented assembly is used, the connectivity of the tower body trial assembly must be ensured.

‌Number of bolts‌: The number of bolts connected to each node of the trial assembly should not be less than 75% of the total number of connecting bolts, and no less than 3.

‌Check connectivity‌: During segmented assembly, the connectivity of all nodes must be ensured to ensure the integrity of the tower body.